Waterloo and City rebuild
3 posters
Page 1 of 1
Waterloo and City rebuild
Hi all,
Here is a few screenshots from my WIP Waterloo and City line for BVE4/OpenBVE, the route will start from Waterloo and end at Bank, given time I plan to extend back to Waterloo depot.
Square tunnel after leaving Waterloo.
.
Entering regular tube tunnel
Under Blackfriars.
The start of Bank station, very much WIP.
End of the line.
Still plenty to do...
Adam.
Here is a few screenshots from my WIP Waterloo and City line for BVE4/OpenBVE, the route will start from Waterloo and end at Bank, given time I plan to extend back to Waterloo depot.
Square tunnel after leaving Waterloo.
.
Entering regular tube tunnel
Under Blackfriars.
The start of Bank station, very much WIP.
End of the line.
Still plenty to do...
- Finish Bank station.
- Build Bank crossover.
- Build Waterloo station, I started it but deleted it as I wasn't happy with it.
- Finish building the new curved rails.
- Speed limits.
Adam.
Re: Waterloo and City rebuild
Little update.
Bank crossover, pretty much complete.
Bank, changed a few textures to make it a little more realistic and added the disabled ramp, still loads to do though.
Bank crossover, pretty much complete.
Bank, changed a few textures to make it a little more realistic and added the disabled ramp, still loads to do though.
Last edited by ap1991 on Tue Jul 29, 2014 6:04 pm; edited 1 time in total
Similar topics
» Waterloo & City Line Waterloo to Bank & Return
» Waterloo & City Line Waterloo to Bank & Return
» New York City Transit (Q) Line and NYCTA Trains WIP
» City and South London Railway
» London Underground Waterloo and City line
» Waterloo & City Line Waterloo to Bank & Return
» New York City Transit (Q) Line and NYCTA Trains WIP
» City and South London Railway
» London Underground Waterloo and City line
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum