1992 stock update and a route to go with it ;)
+18
Stephen Cross
jack123
hugowong
tonytrainsfree1
Greater Anglia Metro
tonytrainsfree
meridian222017
graymac
MellowYellow
joeyfjj
Neil
Drag0nflamez
johnsinden
busheyheath
mrknowitall
viccylinefan
thachieman350
Ad1992
22 posters
Page 3 of 4
Page 3 of 4 • 1, 2, 3, 4
Re: 1992 stock update and a route to go with it ;)
That's fine, there's nothing else to kvetch about, it's high quality work.
New topic opened here on the subject of want/greed/materialism etc.
https://bveworldwide.forumotion.com/t697-summat-for-nowt#8301
New topic opened here on the subject of want/greed/materialism etc.
https://bveworldwide.forumotion.com/t697-summat-for-nowt#8301
Last edited by graymac on Wed Oct 24, 2012 6:21 pm; edited 1 time in total
Re: 1992 stock update and a route to go with it ;)
.
Last edited by Ad1992 on Mon Mar 25, 2013 12:38 am; edited 1 time in total
Re: 1992 stock update and a route to go with it ;)
That looks brilliant!
What resolution are the textures? With modern graphics cards/screens I love going to town on the resolutions, like was done on the original BVE4 JLE, unfortunate that at the time it was ahead of it's time and had to be downsized due to not running on everyones computer.
What resolution are the textures? With modern graphics cards/screens I love going to town on the resolutions, like was done on the original BVE4 JLE, unfortunate that at the time it was ahead of it's time and had to be downsized due to not running on everyones computer.
Greater Anglia Metro- Posts : 135
Join date : 2012-03-24
Age : 31
Location : London
Re: 1992 stock update and a route to go with it ;)
The resolutions vary. I was one of the original authors of the bve 4 JLE, but yes you are correct it was ahead of it's time and had too much code and superior textures. I am taking advantage of openbve's graphical capabilities and making my stations look the best they can.
The sound in Open has been greatly improved as well, the 1992 stock motor is actually made up of the real motor samples and loops flawlessly, which is something I am proud of. But it would be nice if Open advances to the point where you could create the piston effect of a train approaching; whilst the camera is on the platform.
Although it isn't in place yet it will also have working ATP with manual and auto, as well as the block and standard signals were necessary. I haven't got a video of it at the moment but the platform screens are working and even flash *stand back train approaching*
The sound in Open has been greatly improved as well, the 1992 stock motor is actually made up of the real motor samples and loops flawlessly, which is something I am proud of. But it would be nice if Open advances to the point where you could create the piston effect of a train approaching; whilst the camera is on the platform.
Although it isn't in place yet it will also have working ATP with manual and auto, as well as the block and standard signals were necessary. I haven't got a video of it at the moment but the platform screens are working and even flash *stand back train approaching*
Re: 1992 stock update and a route to go with it ;)
.
Last edited by Ad1992 on Mon Mar 25, 2013 12:39 am; edited 1 time in total
Re: 1992 stock update and a route to go with it ;)
Ad1992 wrote:There has been a bit of a delay with this due to us missing gradient information. Well i'm happy to say that has now been obtained and the route is now continuing, here is a screenshot of a now finished queensway, and a wip notting hill gate.
[img][/img][img][/img]
hi ad1992 whare did you get the gradents from.
thanks tonytrainsfree1
tonytrainsfree1- Posts : 43
Join date : 2012-08-30
Re: 1992 stock update and a route to go with it ;)
Likely a FoIA request spam -.-tonytrainsfree1 wrote:Ad1992 wrote:There has been a bit of a delay with this due to us missing gradient information. Well i'm happy to say that has now been obtained and the route is now continuing, here is a screenshot of a now finished queensway, and a wip notting hill gate.
[img][/img][img][/img]
hi ad1992 whare did you get the gradents from.
thanks tonytrainsfree1
http://www.tfl.gov.uk/foi/
Drag0nflamez- Posts : 210
Join date : 2012-05-11
Location : The Netherlands
Re: 1992 stock update and a route to go with it ;)
I really can't wait. Is there a date it's coming out ?
Guest- Guest
Re: 1992 stock update and a route to go with it ;)
Yes when it's finished. Hopefully the first release will be done by sometime this year ideally the middle of the year. but i'm not promising anything.
The first release will be Ealing Broadway to Liverpool Street.
The first release will be Ealing Broadway to Liverpool Street.
Re: 1992 stock update and a route to go with it ;)
If the train is finished can you but a download link for that. Also would the route and train work for mac because some of the OpenBve routes and trains don't work on mac ?
Guest- Guest
Re: 1992 stock update and a route to go with it ;)
Firstly since when have I said anything is finished? Secondly I will put a download link when I feel like it, which won't be until it's finished.
Re: 1992 stock update and a route to go with it ;)
West Acton is finished and North Acton is currently being worked on.
Re: 1992 stock update and a route to go with it ;)
Wait for your good news!!!! Would U mind to upload some video to share the progress of your project with us????Ad1992 wrote:West Acton is finished and North Acton is currently being worked on.
hugowong- Posts : 14
Join date : 2012-08-02
Location : Hong Kong
Re: 1992 stock update and a route to go with it ;)
Not yet although I do intend to add another video soon.
Re: 1992 stock update and a route to go with it ;)
.
Last edited by Ad1992 on Mon Mar 25, 2013 12:40 am; edited 1 time in total
Re: 1992 stock update and a route to go with it ;)
Just seen your ATP video, wow just wow! That is better than world of subways! I would buy that if it was in a shop! Your have 100% made the most realistic LU Route ever! It's made all the other routes look nothing haha! Is it still on track to be released in the middle of the year? Is there much work to still be done? I can't actually wait for it! I'm gonna be driving it all day and all night!!!!
Last edited by Northern Line on Fri Mar 08, 2013 2:20 am; edited 1 time in total (Reason for editing : Spelling Check ;))
jack123- Posts : 40
Join date : 2012-12-05
Age : 26
Re: 1992 stock update and a route to go with it ;)
Nothing? To be fair the Northern line and the Jubilee line showed a lot of people that if you put the effort in it's amazing what can be accomplished in bve underground routes. We have just taken it a bit further.
Ideally yes I want to to release it in the middle of the year, but if it isn't it's because it isn't finished and i'm sure the majority don't want an unfinished route.
Ideally yes I want to to release it in the middle of the year, but if it isn't it's because it isn't finished and i'm sure the majority don't want an unfinished route.
Last edited by Ad1992 on Mon Mar 25, 2013 12:41 am; edited 1 time in total
Re: 1992 stock update and a route to go with it ;)
Those deceleration sounds are spot on.
Greater Anglia Metro- Posts : 135
Join date : 2012-03-24
Age : 31
Location : London
Re: 1992 stock update and a route to go with it ;)
I know it's been a while, and after a while people often think things have been abondoned. Well rest assured this is still progressing and as it's been a while without any sort of update here are some screenshots.
Ealing Broadway still a wip
Another shot of Ealing Broadway
This is North Acton, albeit without any background scenery for the moment.
White City approach
White City platform still a wip.
Notting Hill Gate which i've nearly finished
And finally..
This is Shepherds Bush.
The rest of the stations have been seen in videos so I didn't see any point in showing those again. Also remember that any videos I have or will post will be found here: https://vimeo.com/user17277705/videos
Ealing Broadway still a wip
Another shot of Ealing Broadway
This is North Acton, albeit without any background scenery for the moment.
White City approach
White City platform still a wip.
Notting Hill Gate which i've nearly finished
And finally..
This is Shepherds Bush.
The rest of the stations have been seen in videos so I didn't see any point in showing those again. Also remember that any videos I have or will post will be found here: https://vimeo.com/user17277705/videos
Last edited by Ad1992 on Thu May 09, 2013 2:06 am; edited 1 time in total
Re: 1992 stock update and a route to go with it ;)
Hi,
I feel that I could walk along Shepherds Bush platform it looks so realistic. Looking great, I await its release.
Bye for now,
Stephen.
I feel that I could walk along Shepherds Bush platform it looks so realistic. Looking great, I await its release.
Bye for now,
Stephen.
Re: 1992 stock update and a route to go with it ;)
Are you developing the central Line with Anonymous????
I saw than Anonymous's youtube video was using your 1992 stock and he extend the route to Mile End. The object of the route in his video is simular to your Central Line.....
I saw than Anonymous's youtube video was using your 1992 stock and he extend the route to Mile End. The object of the route in his video is simular to your Central Line.....
hugowong- Posts : 14
Join date : 2012-08-02
Location : Hong Kong
Re: 1992 stock update and a route to go with it ;)
No I am most definately not. Although the route will go further than Liverpool Street.
At the risk of sounding arrogant can you not tell the difference in quality between both routes? Furthermore that is not the same 1992 stock as mine.
At the risk of sounding arrogant can you not tell the difference in quality between both routes? Furthermore that is not the same 1992 stock as mine.
Page 3 of 4 • 1, 2, 3, 4
Similar topics
» Openbve 1992 stock and central line route
» Edit train (1992 stock)
» Were can i find the external for the 1992 ts stock.
» Central Line Openbve Technical Problems
» Building a Route Based on the Staten Island Railway Integrated into the NYC Subway System (Download Update 10/24/2023)
» Edit train (1992 stock)
» Were can i find the external for the 1992 ts stock.
» Central Line Openbve Technical Problems
» Building a Route Based on the Staten Island Railway Integrated into the NYC Subway System (Download Update 10/24/2023)
Page 3 of 4
Permissions in this forum:
You cannot reply to topics in this forum
|
|